...
- get the avs load results data from the FTP server
- add the "eas_id" column to the AVS addresses table
- use the avs load results data to update the eas_id column
...
Parallel Testing (Dec 5 through Dec 23)
- confirm that the Change Notification is configured with DBI QA as target.
- For every address modified in AVS PROD, make the same changes in EAS PROD.
- Jeff and Paul will be available on site at DBI for training as needed.
- At the end of each day (or week), confirm that AVS QA and AVS PROD are materially the same.