Penultimate AVS-EAS ETL (Dec 2)
- Run this ETL over the weekend the disable it on Monday morning (December 5)
...
- for the second to last time, then disable it.
Populate AVS QA with primary keys from EAS.
After penultimate AVS-EAS ETL, DBI must do the following:
- get the avs load results data from the FTP server
- add the "eas_id" column to the AVS addresses table
- use the avs load results data to update the eas_id column
Parallel Testing (Dec 5 through Dec 23)
- confirm that the Change Notification is configured with DBI QA as target.
- For every address modified in AVS PROD, make the same changes in EAS PROD.
- Jeff and Paul will be available on site at DBI for training as needed.
- At the end of each day (or week), confirm that AVS QA and AVS PROD are materially the same.TODO - does AVS have a way to extract "changes since yesterday"?