Issue List

The open issue list for the 1.1 release is here

http://code.google.com/p/eas/issues/list?can=2&q=Milestone%3DRelease1.1

Monitoring Setup

COMPLETED
The best way to see what we are monitoring is to look at the nagios web page

http://10.1.3.155/nagios/ (auth required - contact Paul)

We put the nagios configurations into a jira project which is here

http://sfgovdt.jira.com/wiki/display/NAGIOS/Home

Integration Testing

COMPLETED
See this page for details.

http://sfgovdt.jira.com/wiki/display/MAD/EAS-AVS+Integration+Testing

Parallel Testing

COMPLETED
The parallel testing plan is here

http://sfgovdt.jira.com/wiki/display/MAD/EAS-AVS+Parallel+Testing

Business Continuation Testing

COMPLETED

The business continuation plan is here

http://sfgovdt.jira.com/wiki/display/MAD/Business+Continuation+Plan

Go Live

PENDING

The day we've all been waiting for!

Tuesday Feb 14

1700

0) Confirm that we have the latest AVS dump on the FTP site.

1) DT will run a specific set of jobs. These are listed here.

http://sfgovdt.jira.com/wiki/display/MAD/scheduled+jobs

For each job marked with an X in the "GO LIVE" column, you must do the following
Disable the job from being run automatically.
Starting at 1700, run the jobs manually, in the temporal order.
Do not enable the automation of these jobs until the following day.
The AVS Load will write a file to ftp://esfftp.sfgov.org/dbi-external/avsEasLoadResults.csv.
This will be used later.

2) DBI shall modify portions of their ETL from the Assessor into the AVS.
2.1) stop loading addresses into AVS
2.2) continue to load ownership information

3) DBI shall disable the AVS address editing form
3.1) should an "orphaned" address need to be retired, counter staff shall contact MIS.

Feb 15

0730

4) DBI DBA/developer shall do the following
4.1) backup the AVS addresses table
4.2) add the eas_id column to the addresses table
4.3) download the "AVS To EAS Load" results file from the FTP server (ftp://esfftp.sfgov.org/dbi-external/avsEasLoadResults.csv)
4.4) use the avs load results data to update the eas_id column

5) Insure that all jobs on this page

http://sfgovdt.jira.com/wiki/display/MAD/scheduled+jobs
with a "2" in the notes column must be turned off permanantly.

7) DBI shall make a PROD path available on their web server for the change notifcations.

 

XXX

 

Right now we use

dbiweb.sfgov.org/dbiws_eas_qa/eas_to_dbi.asmx/postAddressXMLtoDBI.

I think we need to an different path, something like

dbiweb.sfgov.org/dbiws_eas_prod/eas_to_dbi.asmx/postAddressXMLtoDBI.

8) Whatever the path is in the item above, we need to add that to this line of EAS code

http://sfgovdt.jira.com/source/browse/MAD/trunk/web/settings_env/live/environments.py?r=3114#to67

 